The 110/10 kV substation in the Zamiin-Uud soum was expanded and a 2 × 16 MW substation was built and connected to the Zamiin-Uud Free Zone via an overhead electric transmission line. In addition, 16 substations and distribution facilities which have a capacity of 10/04 kV were built.
Currently, equipment is being installed on 04 sides of the substation. As part of the canal construction of 16 substations, a 1m wide, 1.10 cm deep, 11 m long canal was dug, excavated to complete concrete preparation.
According to the agreement with the Ministry of Energy signed in November, Contractor planned to complete the installation and put it into operation in July. Upon completion of the substation work, an uninterrupted power supply will be provided to businesses and individuals operating in the free zone.